Beauchamp Middle School Bedford Library And Classrooms Fitted With Carpet

Monday, April 20th, 2009

A member of staff from the Beauchamp Middles School in Bedford contacted us by email with their flooring needs; they also specified the address and the best time to visit the site to provide a detailed quote.

School BeforeBeauchamp Middle School Library

The main area that required carpeting was in the ground floor of the school library however during the visit they also mentioned that they might be doing some classrooms. We thought it best to provide quotes to complete both the library and the three classrooms. The quote must have been competitive as we were selected to do the flooring installations.

Beauchamp Middle School LibraryBeauchamp Middle School Library

In order to complete the work with the minimum disruption to the academic work of the students and teachers we arranged to carry out the installation during the Easter holidays when most of the teachers and students were not on the premises allowing us to uplift the old carpet and bring in the new minimising all health and safety hazards.

Beauchamp Middle School Library

If you are a local government office, school or college and you need new flooring, carpeting or vinyl please feel free to give us a call and we will arrange to meet with you to discuss your needs and provide you with a quote. We are happy to arrange an installation time that suits you to ensure minimal disruption to your business hours where possible.

Carpet fitted in the Communal Areas and Training rooms in the RNIB College Loughborough

Monday, April 6th, 2009

The Royal National Institute for the Blind (RNIB) college on Radmoor road in Loughborough contacted us for a quote for some replacement carpet. We visited the site and had a look at the areas that needed replacement flooring. We took time to discuss the their requirements looking at a variety of flooring materials before settling on those that suited the areas to be covered. After winning the tender we had to investigate the restrictions that would impact the installation.

RNIB College Loughborough Landing1

RNIB College Loughborough hallway3

The communal areas including stairs and landings were first to be done in the evening after 5pm and weekends. We then planned to do some of the training facilities which required the work being carried out during the time when the rooms were not in use over a period of a couple of weeks.

RNIB College LoughboroughRNIB College Loughborough